Unit # 1 & 2 : COOLING WATER & AUXILIARY COOLING WATER EQUIPMENT AND ASSOCIATED PIPING ETC. FGD SYSTEM (MECHANICAL) RELATED AUXILIARIES AND GYPSUM DEWATERING SYSTEM ETC.
Unit # 1 & 2 : L.P PIPING, SEA WATER PIPING, FPS - PIPING, PLANT WATER SYSTEM PIPING, INST. & SERVICE AIR SYSTEM, DM CW SYSTEM, PTRO-DM PLANT SYSTEM, PUMPS & MISC. EQUIPMENTS, SERVICE & POTABLE WATER SYSTEM Unit # 1 & 3 : POWER CYCLE PIPING AND ALL ASSOCAITED PIPING, INSULATION WORK ETC ESP & ITS AUXILIARIES, DAMPERS, DAMPERS, PAINTING ETC Unit # 1 & 5 : LP PIPING, RAW WATER SYSTEM PIPING, PLANT WATER SYSTEM, PLANT WATER SYSTEM PIPING, DM CW SYSTEM, INSTRUMENT & SERVICE AIR SYSTEM, PLANT SERVICE & POTABLE WATER SYSTEM, PUMPS & MISC. EQUIPMENTS, HANGERS & SUPPORTS, VALVES ETC. FIRE PROTECTION SYSTEM AND ALL OTHER COMMON AREA WORKS OF ALL UNITSFIRE PROTECTION SYSTEM AND ALL OTHER COMMON AREA WORKS OF ALL UNITS
Unit # 1: POWER CYCLE PIPING, L.P PIPING & ITS ASSOCIATED ITEMS/SYSTEMS, HANGERS & SUPPORTS, VALVES ETC.
Unit # 1 : BOILER & its AUX., APHs, DUCTS, DAMPERS, FUEL PIPING, BOILER INTEGRAL PIPING & ASSOC. VALVES, FANS, L.P PIPING ETC. Unit # 2 : ESP, DUCTS SUPPORTING STRUCTURE, DUCTS & DAMPERS FROM ESP O/L FUNNEL TO CHIMNEY INSULATION, PAINTING WORKS
Unit # 12 : POWER CYCLE PIPING & AUX. BOIILER PIPING, L.P PIPING, FPS PIPING, FAB. OF VALVES, MISC. EQUIPMENT, PAINTING WORKS, FAB & ERE OF FPS TANKS, HANGERS & SUPPORTS ETC.
Unit # 1 : ESP & ITS AUXILIARIES, DUCTS & DAMPERS, ID FANS DUCT SUPPORTING STRUCTURE, INSULATION WORK, PAINTING ETC.
Unit # 2 : LOW PRESSURE PIPING & ITS ACCESSORIES, HANGERS & SUPPORTS, VALVES, MISC. SYSTEMS AND OTHER STATIC EQUIPMENT ETC.
Unit # 3 : L.P PIPING & ITS ACCESSORIES, HANGERS&SUPPORTS, ACW, SERVICE WATER PIPING, TG ACW SYSTEM, FIRE WATER, DM WATER, SERVICE & INST. AIR SYSTEM, SG&TG CW PIPING, MISC. EQUIPMENT, PAINTING
Unit # 1 to 4 : LOW PRESSURE PIPING, MISC. MECHANICAL EQUIPMENT, ROTATING EQUIPMENT, MILL REJECT SYSTEM & COAL PIPING, BELT CONVEYORS & ASSOCIATED EQUIPMENT, STRUCTURAL STEEL WORKS, ERECTION OF STEAM TURBINE, GENERATOR, CONDENSOR & AUXILIARIES ETC.
Unit # 1 to 4 : PREASSEMBLY & ERECTION OF GGH SUPPORTING STRUCTURE FOR SEA WATER FLUE GAS DESULPHURISING SYSTEM (FGD)
P1 - Unit # 1 & 2 : AMC OF BOILERS & AHPS from 2017 - Present P2 - Unit # 1 & 2 : AMC OF BOILERS & AHPS from 2017 - Present
Unit # 1 to 4 : OVERHAUL & SHUTDOWN WORKS OF BOILERS & AUX.
Unit # 1 : PREVENTIVE, PERIODICAL MAINTENANCE OF BOWL MILLS, GRAVIMETRIC RAW COAL FEEDERS, COAL PIPES & SEAL AIR FANS. Unit # 1&2 : HP & LP WELDING WORKS FOR REPLACEMENT OF DAMAGED VALVES, BENDS AND PIPES ETC. Unit # 1 & 2 : PREVENTIVE, PERIODICAL MAINTENANCE OF FD PA,ID FANS Unit # 4 : PREVENTIVE, PERIODICAL MAINTENANCE OF BOWL MILLS, GRAVIMETRIC RAW COAL FEEDRS, COAL PIPES, & SEAL AIR FANS
UNIT#2 : ANNUAL MAINTENANCE CONTRACT OF TURBINE & GENERATOR OF FOR FY 2025-26.
Unit 1&2: OPERATION AND MAINTENANCE: MAINTENANCE SERVICES INCLUDING PREVENTIVE, PREDICTIVE, PLANNED & BREAKDOWN JOBS FOR ALL EQUIPMENT, SYSTEMS AND AUXILIARIES OF BOILER, TURBINE, GENERATOR (BTG) AND BALANCE OF PLANT (BOP) & COMMON AREAS. OPERATION & MAINTENANCE SERVICES INCLUDING PREVENTIVE, PREDICTIVE, PLANNED & BREAKDOWN JOBS FOR ALL EQUIPMENT, SYSTEMS AND AUXILIARIES OF ASH HANDLING PLANT (AHP) AND OIL SHALE HANDLING PLANT (OSHP). WITH CONTRACT PERIOD OF 3 YEARS AND MOBILIZATION OF 125 SKILLED PERSONNEL. SALIENT FEATURES OF PROJECT: ➢ FIRST OIL SHALE POWER PLANT IN JORDAN ➢ FIRST PITHEAD THERMAL POWER PLANT IN JORDAN ➢ PROVIDING LONG TERM ENERGY SECURITY TO JORDAN.
UNIT#2 : ANNUAL MAINTENANCE CONTRACT OF TURBINE & GENERATOR OF FOR FY 2025-26.
CARRYING VARIOUS O & M WORKS FROM APRIL 2016 - Present ANNUAL MAINTENANCE CONTRACTS FOR BOILER & AHP. PROVIDING OPEARTIONAL SUPPORT FOR ALL AREAS EXCLUDING CHP. BOILER CAPITAL OVERHAULING WORKS. ANNUAL OVERHAULING WORKS. COAL MILLS MAINTENANCE WORKS. PROVING ADDITIONAL MANPOWER SUPPORT IN BOILER AND APH AREA.
CARRYING VARIOUS O & M WORKS FROM JUNE 2015 - PROVIDING OPERATION SUPPORT. ANNUAL MAINTENANCE CONTRACT FOR BOILER & AHP BOILER SHUTDOWN WORKS. BOILER CAPITAL OVERHAULING WORKS. COAL MILLS FEEDERS AND BUNKER WORKS. FSH & FRH HEADER STUBS REPAIR WORKS. AST-TDBFP STEAM LINE MODIFICATION WORKS. ADDITIONAL MANPOWER SERVICES DURING SHORT DOWNS
Unit # 1&2 : OPERATION OF BOILER TURBINE GENERATOR & BALANCE OF PLANT (BOP) AREA (Till March 2025)
Unit # 1&2 : ANNUAL MAINTENANCE AND OVERHAUL WORK OF COAL MILLS, FANS, PRESSURE PARTS Etc.
Unit # 9 & 10 : SHUTDOWN WORK - MODIFICATION OF 2 NOS AIR PREHEATERS (Size 27.5 VIT 2000)
Unit # 1 to 4: PREVENTIVE AND CONDITIONAL BASED MAINTENANCE OF TG & AUXILIARIES - 2012-13 ANNUAL MAINTENANCE CONTRACT OF TG & AUXILIARIES FOR 5 YEARS (From 2013-2018) BREAKDOWN MAINTENANCE FOR TG & BOP EQUIPMENT
Unit # 1 & 2: BREAKDOWN MAINTENANCE WORKS OF BOILER INSTALLATION, BLUE MATCHING, ALIGNMENT OF ROTATING EQUIPMENT ANNUAL OVERHAUL WORKS OF TG (FOR 7 YEARS)
Unit # 1 & 2 ANNUAL MAINTENANCE AND OVERHAUL WORKS OF BOILER & TG (FOR 3 YEARS)
Unit # 1 : FACILITATING SHOT PEENING OF SUPERHEATER (S40) COILS INCLUDING LOWERING OF COILS, DISMANTLING OF STRUCTURES & PRESSURE PARTS, RE-ERECTION OF COILS ETC.