GALLERY

SECTION 1: OUR WORKS

1.1.1 Power-Cycle/High-Pressure Piping
1.1.2 Cooling Water Piping
1.1.3 LP Piping
1.2.1 Cross-Over Piping
1.2.2 Power Cycle Piping - Insulation Works
1.2.3 Power Cycle Piping - Insulation Works
1.3.1 Hot Reheat Piping
1.3.2 Fire Protection System Piping
1.3.3 Boiler Feed Pump - Flow Nozzle
1.4.1 Sea Water Pipeline
1.4.2 Raw Water Pipeline
1.4.3 MS Line Erection & Insulation
1.5.1 Fire Protection System Piping
1.5.2 LP Piping
1.5.3 DMCW System Piping
1.6.1 Instrument & Service Air System Piping
1.6.2 Boiler Drum Lifting
1.6.3 Boiler Drum Lifting
1.7.1 Boiler Drum Erection
1.7.2 CW Line Erection
1.7.3 Sea Water Line Piping
1.8.1 Turbine - Generator
1.8.2 Electro-Static Precipitator (ESP)
1.8.3 Duct Fabrication
1.9.1 Rack Pipes
1.9.2 ACW Piping - TG Area
1.9.3 TG & SG - DMCW Lines
1.10.1 Coal Bunkers
1.10.2 Coal Handling Plant
1.10.3 Boiler
1.11.1 Dearator
1.11.2 Coil Modification
1.11.3 Air Prheater
1.12.1 FGD-GGH Supporting structure
1.12.2 Coal Mills
1.13.1 Duct Erection
1.13.2 FGD Absorber Tank
1.13.3 RC Pumps & Discharge Piping
1.14.1 Welding
1.14.2 Welding - Alignment
1.14.3 Welding - NDT Inspection

SECTION 2: SAFETY & TRAINING

2.1.1 Toolbox Meeting
2.1.2 Toolbox Meeting
2.1.3 Welder Toolbox Meeting
2.2.1 Welder Toolbox Meeting
Landscape 1
2.2.2 Safety Practices
2.2.3 Fire Drill Training
2.3.1 First-Aid Training

SECTION 3: QUALITY

3.1.1 Quality Awards
3.1.2 Quality Awards